Case Study: Deli Express
Before and After Cable Management Installation
Deli Express consulted with Communication Systems Specialists
to create an organized look to their data cabling network.
The original cabling system was installed in the mid 1990s
and still operates well with the current network requirements.
However, the IT staff had a desire to organize the cable plant
and better facilitate troubleshooting.
CSS used new Panduit PRV6 vertical and NCMHF1 horizontal management
and new Belden Mediatwist patch cables to create an organized
and clean patching system.

BEFORE
|
|
AFTER
|
 |
 |

|